We beat the competition by 25% on yearly contracts and warranties.
500-Amp Level 3 EV Charging Corridor Plan Unveiled

500-Amp Level 3 EV Charging Corridor Plan Unveiled

By Infrastructure Team · Jun 22, 2026

Cyber Beast platform to connect rural EV fast-charging stations with high-speed internet hubs across Washington transit corridors.

Project America has released its strategic plan for deploying 500-amp Level 3 fast-charging infrastructure across rural Washington corridors, integrated with high-speed internet connectivity at every location.

The Cyber Beast platform will serve as the backbone for this statewide network, connecting charging hubs with existing transit stations and train lines throughout Washington.